RESOURCES · TOOL
PCBA Project BOM Template - MJX
Printable as PDF (Ctrl+P)
HOW TO USEOrganize your BOM in this structure — both providers and factories read it instantly. Export to Excel, one per project.
| Layer | Field | Notes | Example |
|---|---|---|---|
| ① Core | MCU part number | Primary + pin-to-pin alternate (≥1) | STM32G431 / GD32F303 |
| Package / pins | e.g. LQFP48 — affects layout | LQFP48 | |
| Source & lead time | Franchised / spot, standard lead time | Franchised · 8 wks | |
| Unit price | Quoted at target volume, with currency | $1.75 @5k | |
| ② Power | Power topology | AC-DC / DC-DC / linear with headroom | DC-DC 24V→5V 3A |
| Power devices | MOS/diodes with ratings | AO3400 ×4 | |
| Protection | TVS/fuse/thermistor — compliance related | SMBJ15CA | |
| ③ Peripherals | Sensors | Part + accuracy + calibration needs | NTC 10K ±1% |
| Connectors | Type/pins/brand (audited in compliance) | JST PH2.0-4P | |
| Indication & UX | LEDs/keys/display with specs | WS2812B ×8 | |
| ④ Mechanical | Enclosure parts | Housing/bracket/heat sink; tooling ownership | Client-supplied / T1 |
| Consumables | Solder/glue/thermal pad — RoHS related | SAC305 lead-free |
Cost Formulas
- Material cost = Σ(unit price × qty) + scrap rate (SMT 1–2%, mechanical 2–3%)
- PCBA processing = placements × rate + THT/rework labor + test labor
- Landed cost = material + processing + packaging + certification amortization + freight + duty
- Reserve 5–8% buffer for material swings (account long-lead parts separately)
Ready to Start?
Send your product requirement — our engineering team responds within 1 business day with a free assessment and quotation.
WeChat
kb19232866955
Phonekb19232866955
+86 192-3286-6955 Email
[email protected]
Working Hours
Mon–Sat 9:00–19:00 (GMT+8)
Mon–Sat 9:00–19:00 (GMT+8)
Thank you! We’ve received your inquiry and will respond within 1 business day.