Hotline+86 192-3286-6955 [email protected] Mon–Sat 9:00–19:00 (GMT+8)
SOLUTION BRIEF

Floor Washing Robot Solution · Solution Brief

Roller wash + dirty-water recovery + self-clean dock — a washing robot platform.

Printable as PDF (Ctrl+P) · contact us for the official release

DEFINITIONA floor washing robot solution integrates roller scrubbing, real-time dirty-water recovery, a self-cleaning dock and navigation mapping — the fusion of robot vacuums and floor washers. Water sealing, recovery efficiency and dock logic are the keys. AVC data shows +295% retail growth during 2025 11.11, the fastest-growing cleaning niche.

Key Features

Roller WashingHigh-speed roller with live clean-water spray
Dirty-water RecoverySeparate recovery path with air-liquid separation, 95%+
Self-clean DockRoller self-wash + heated drying + auto water exchange
NavigationLiDAR/visual SLAM with zone cleaning and no-go areas
Residue ControlSqueegee + suction coordination, < 5g/m²

Solution Specifications

Typical Washing Robot Specs
MCU32-bit MCU + navigation SoC
CleaningRoller + spray, 25–30cm width
WaterClean 0.6–1L / dirty 0.5–0.9L
DockSelf-wash + heated dry + auto plumbing (optional)
NavigationLiDAR SLAM / visual
Battery5200–8000mAh, 90–150min
Noise< 65dB
ComplianceCE / FCC / RoHS

Deliverables

  • Complete solution (main + water system + dock)
  • Water sealing and recovery design
  • Dock logic with FMEA
  • Samples + cleaning/residue testing

Key Facts

MCU Platform32-bit MCU + navigation SoC
Dev Cycle10-day eval / 45-day first build
MOQProject-based · 500+ pilot
EngagementJoint ODM / second source

FAQ

How does it differ from a floor washer?
A floor washer is pushed by hand; a washing robot navigates autonomously with a self-cleaning dock — essentially a robot vacuum plus a water system.
Where does +295% come from?
AVC 2025 11.11 monitoring: washing robot retail value +295% — a breakout against an otherwise declining cleaning market.
How is dirty water recovered?
A dedicated recovery path with air-liquid separation achieves 95%+; sealing and backflow prevention are critical — FMEA and line air-tightness testing included.

Get the full documentation

Official spec sheets, BOMs and test reports are available under NDA.

Get a Quote

Ready to Start?

Send your product requirement — our engineering team responds within 1 business day with a free assessment and quotation.

WeChat
kb19232866955
Phone
+86 192-3286-6955
Email
[email protected]
Working Hours
Mon–Sat 9:00–19:00 (GMT+8)

Your information stays strictly confidential. Typical reply within 1 business day.

Thank you! We’ve received your inquiry and will respond within 1 business day.